U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation.
Also known as
U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation
Identifiers
- Open LibraryOL1700661A
Top Subjects
- Nuclear power plants -- United States -- Safety measures (11)
- Nuclear power plants -- California -- Safety measures (8)
- Nuclear power plants -- Environmental aspects -- California (7)
- Nuclear power plants -- Environmental aspects -- United States (6)
- Nuclear power plants -- Environmental aspects -- Tennessee (5)
- Tennessee Valley Authority (4)
- Nuclear power plants -- United States (4)
Books by U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation.
Total count: 160
-
Safety evaluation reportNuclear Regulatory Commission, Office of Nuclear Reactor Regulation1974-01-01
-
Final environmental statement related to construction of Pebble Springs Nuclear Plant, units 1 and 2docket nos. 50-514 and 50-515, Portland General Electric Company.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1975-01-01
-
Final environmental statement related to construction of Skagit nuclear power projectunits 1 and 2, Puget Sound Power & Light Company, et al.available from National Technical Information Service1975-01-01
-
Final environmental statement by the Office of Nuclear Reactor Regulation, United States Nuclear Regulatory Commission, related to the proposed manufacture of floating nuclear power plants offshore power systemsdocket no. STN 50-437.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1976-01-01
-
Final environment statement by the U.S. Nuclear Regulatory Commission [Office of Nuclear Reactor Regulation] for Yellow Creek Nuclear Plant Units 1 and 2 ; proposed by Tennessee Valley Authority ; docket nos. STN 50-566 and STN 50-567.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1977-01-01
-
Final environment statement by the U.S. Nuclear Regulatory Commission [Office of Nuclear Reactor Regulation] for Yellow Creek Nuclear Plant Units 1 and 2 ; proposed by Tennessee Valley Authority ; docket nos. STN 50-566 and STN 50-567for sale by the National Technical Information Service1977-01-01
-
Final environmental statement related to construction of Montague Nuclear Power Station, Units 1 and 2Docket nos. 50-496 and 50-497The Office1977-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Tennessee Valley Authority, Yellow Creek Nuclear Plant Units 1 and 2, Docket nos. STN 50-566 and STN 50-567.for sale by the National Technical Information Service1977-01-01
-
Supplement no. 1 to the final environmental statement related to operation of Donald C. Cook Nuclear Plant, Unit nos. 1 and 2, Docket nos. 50-315 and 5-316Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1977-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Puget Sound Power and Light Company [et al.], Skagit Nuclear Power Project, Units 1 and 2, Docket nos. 50-522 and 50-523 : [main report].[for sale by the] National Technical Information Service1977-01-01
-
Supplement no. 8 to the safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Virginia Electric and Power Company, North Anna Power Station, Units 1 and 2, Docket Nos. 50-338 and 50-339for sale by the National Technical Information Service1977-01-01
-
Informe final sobre el ambiente por la Comision Reguladora Nuclear Estadounidense, Oficina de Reglamentacion de Reactores Nucleares relativo a la determinacion de la adecuacida de la ubicacion Islote para la eventual construccion de la Planta Nuclear de la Costa Norte, Unidad no. 1 por la Authoridad de Recursos de Agua de Puerto Rico, Actuacion no. 50-376Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1977-01-01
-
Safety evaluation reportNuclear Regulatory Commission, Office of Nuclear Reactor Regulation1977-01-01
-
Final environmental statement by the U.S. Nuclear Regulatory Commission for Shoreham Nuclear Power Station, Unit 1, proposed by Long Island Lighting Company, Docket No. 50-322.for sale by the National Technical Information Service1977-01-01
-
Supplement no. 1 to the final environmental statement related to operation of Donald C. Cook Nuclear Plant, Unit nos. 1 and 2, Docket nos. 50-315 and 5-316.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1977-01-01
-
Interim safety evaluation by the Office of Reactor Regulation, United States Nuclear Regulatory Commission, in the matter of the Detroit Edison Company, Enrico, Fermi Atomic Power Plant, Unit 2, Docket no. 50-341for sale by the National Technical Information Service1977-01-01
-
Final environmental statement by the U.S. Nuclear Regulatory Commission [Office of Nuclear Reactor Regulation] for Yellow Creek Nuclear Plant Units 1 nd 2 ; proposed by Tennessee Valley Authority ; docket nos. STN 50-566 and STN 50-567.for sale by the National Technical Information Service1977-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Puget Sound Power and Light Company, Skagit Nuclear Power Project, Units 1 and 2, docket nos. 50-522 and 50-523.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1977-01-01
-
Final supplement to the final environmental statement related to the construction of Allens Creek Nuclear Generating Station, Unit no. 1, Houston Lighting and Power Company, docket no. 50-466for sale by the National Technical Information Service1978-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Georgia Power Company, Oglethorpe Electric Membership Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia, Edwin I. Hatch Nuclear Plant unit no. 2, docket no. 50-366.for sale by the National Technical Information Service1978-01-01
-
Final environmental statement related to operation of Edwin I. Hatch Nuclear Plant Unit no. 2Georgia Power Company, Docket no. 50-366.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Supplement no. 2 to the safety evaluation by the Office of Nuclear Reactor Regulation, United States Nuclear Regulatory Commissionin the matter of Metropolitan Edison Company, Jersey Central Power and Light Company, [and] Pennsylvania Electric Company : Three Mile Island Nuclear Station, Unit no. 2 : docket number 50-320for sale by the National Technical Information Service1978-01-01
-
Supplement no. 4 to the safety regulation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Portland General Electric Company, Pebble Springs Nuclear Plant, Units 1 and 2, Docket nos. 50-514 and 50-515Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Supplement no. 1 to the safety evaluation report, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Arkansas Power and Light Company, Arkansas Nuclear One-Unit 2Docket no. 50-368The Commission1978-01-01
-
Final site environmental statement relative to determination of the suitability of the proposed site for eventual construction of Sundesert Nuclear Plant, Units 1 and 2, San Diego Gas and Electric Company, docket nos. 50-582 and 50-583for sale by the National Technical Information Service1978-01-01
-
Final environmental statement by the U.S. Nuclear Regulatory Commission for Watts Bar Nuclear Plant Units 1 and 2, proposed by Tennessee Valley Authority, docket nos. 50-390 and 50-391.for sale by the National Technical Information Service1978-01-01
-
Fire protection, safety evaluation reportNuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Safety evaluation report related to construction of Skagit Nuclear Power Project, Units 1 and 2, Puget Sound Power and Light Company, Pacific Power and Light Company, Washington Water Power Company and Portland General Electric CompanySupplement no. 1National Technical Information Service1978-01-01
-
Supplement no. 1 to the safety evaluation report, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter ofArkansas Power and Light Company, Arkansas Nuclear One - Unit 2 Docket no. 50-368.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Supplement no. 2 to the Safety evaluation report by the Office of Nuclear Reactor Regulation, U. S. Nuclear Regulatory Commission, in the matter of Arkansas Power and Light Company, Arkansas Nuclear One - Unit 2 Docket no.50-368.Springfield, Va.1978-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matterDuke Power Company, McGuire Nuclear Station, Units 1 and 2, Docket Nos. 50-369 and 50-370.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Supplement no. 3 to the Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Public Service Electric and Gas Company, et al., Salem Nuclear Generating Station, Unit 2, Docket no. 50-311.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Supplement no. 5 to the safety regulation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Portland General Electric Company, Pebble Springs Nuclear Plant, Units 1 and 2, Docket nos. 50-514 and 50-515Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, for U.S. Department of Energy, Fast Flux Test Facility, project no. 448.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Draft environmental statement related to construction of Sundesert Nuclear Plant, units 1 and 2, San Diego Gas and Electric CompanyThe Office1978-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Ohio Edison Company, Toledo Edison Company, Cleveland Electric Illuminating Company, Duquesne Light Company, and Pennsylvania Power Comapny, Erie Nuclear Plant, units 1 and 2, docket nos. STN 50-580 and STN 50-581.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
NRC program for the resolution of generic issues related to nuclear power plants(includes plans for the resolution of "Unresolved Safety Issues" pursuant to section 210 of the Energy reorganization act of 1974, as amended) : report to Congress January 1, 1978for sale by the National Technical Information Service1978-01-01
-
Seabrook alternative site studyNRC staff testimony related to alternative sites to Seabrook units 1 and 2, Public Service Company of New HampshireNuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Final addendum to the final environmental statement by the U.S. Nuclear Regulatory Commission related to the operation of Palisades Nuclear Generating Plant by Consumers Power Company, docket no. 50-255for sale by the National Technical Information Service1978-01-01
-
Supplement no. 1 to the Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission in the matter of Public Service Company of Oklahoma, et al., Black Fox Station, Units 1 and 2, docket nos. STN 50-556 and STN 50-557.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Final site environmental statementrelated to the determination of the suitability of site G for eventual construction of the Blue Hills Station, Unit nos. 1 and 2, Gulf States Utilities Company docket nos. 50-510 and 50-511for sale by the National Technical Information Service1978-01-01
-
Final environmental statement related to operation of LaSalle County Station Units 1 and 2, Commonwealth Edison Company, docket nos. 50-373 & 50-374.Nuclear Regulatory Commimission, Office of Nuclear Reactor Regulation1978-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission in the matter New England Power Company, NEP nuclear generating station, unit nos. 1 and 2, docket nos. STN 50-568 and STN 50-569.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Final addendum to part II of the Final environmental statement related to the proposed manufacture of floating nuclear power plants, Offshore Power SystemsAvailable from National Technical Information Service1978-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission in the matter of Toledo Edison Company, Cleveland Electric Illuminating Company, Duquesne Light Company, Ohio Edison Company, and Pennsylvania Power Company, Davis-Besse Nuclear Power Station units 2 and 3, docket nos. 50-500 and 50-501.for sale by the National Technical Information Service1978-01-01
-
Final environmental statement related to determination of the suitability of the Fort Calhoun site for eventual construction of the Fort Calhoun Station Unit No. 2Omaha Public Power District : Docket no. 50-548.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Nuclear security personnel for power plantscontent and review procedures for a security training and qualification programNuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Interim safety evaluation report by the Office of Nuclear Reactor Regulation, United States Nuclear Regulatory Commission, in the matter of the San Diego Gas and Electric Company, Sundesert Nuclear Plan, Units 1 and 2, Docket nos. 50-582 and 50-583for sale by the National Technical Information Service1978-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Westinghouse Electric Corporation reference safety analysis report, RESAR-414, docket no. STN 50-572.for sale by the National Technical Information Service1978-01-01
-
Review of the Commission program for standardization of nuclear power plants and recommendations to improve standardization conceptsfor sale by the National Technical Information Service1978-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission in the matter of Arizona Public Service Company, et al., Palo Verde Nuclear Generating Station, Unit nos. 4 and 5, docket nos. STN 50-592 and 50-593.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Final supplement to the final environmental statement related to the construction of Allens Creek Nuclear Generating Station, Unit no. 1, Houston Lighting and Power Company, docket no. 50-466.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1978-01-01
-
Supplement no. 2 to the Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Duke Power Company, McGuire Nuclear Station, Units 1 and 2, Docket nos. 50-369 and 50-370.available from National Technical Information Service1979-01-01
-
Supplement no. 2 to the Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission in the matter of Public Service Company of Oklahoma, et al., Black Fox Station, Units 1 and 2, Docket nos. STN 50-556 and STN 50-557.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1979-01-01
-
Final supplement to the Final environmental statementfor sale by the National Technical Information Service1979-01-01
-
Supplement no. 1 to the Safety evaluation reportThe Office1979-01-01
-
Supplement no. 1 to the Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Ohio Edison Company, Toledo Edison Company, Cleveland Electric Illuminating Company, Duquesne Light Company, and Pennsylvania Power Comapany, Erie Nuclear Plant, units 1 and 2, Docket nos. STN 50-580 and STN 50-581.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1979-01-01
-
Supplement no. 4 to the Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission in the matter of Boston Edison Company, et al, Pilgrim Nuclear Generating Station, Unit 2, docket no. 50-471.Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1979-01-01
-
Environmental standard review plans for the environmental review of construction permit applications for nuclear power plantsNuclear Regulatory Commission, Office of Nuclear Reactor Regulation1979-01-01
-
Draft emergency action level guidelines for nuclear power plantsNuclear Regulatory Commission, Office of Nuclear Reactor Regulation1979-01-01
-
Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission in the matter of Cincinnati Gas and Electric Company, William H. Zimmer Nuclear Power Station, Unit 1, Docket no. 50-358.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1979-01-01
-
NRC views and analysis of the recommendations of the President's Commission on the Accident at Three Mile IslandThe Office : [available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission]1979-01-01
-
Final environmental statement related to steam generator repair at Surry Power Station, Unit no. 1, Virginia Electric and Power CompanyAvailable from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1980-01-01
-
Safety evaluation report related to the operation of Joseph M. Farley Nuclear Plant, Unit 2, Docket no. 50-364, Alabama Power Company.National Technical Information Service1980-01-01
-
Final environmental statement related to the operation of Joseph M. Farley Nuclear Plant, Units 1 and 2, Docket nos. 50-348 and 50-364, Alabama Power Company.National Technical Information Service1980-01-01
-
Safety evaluation report related to steam generator repair at Turkey Point Plant Units 3 and 4, Docket nos. 50-250 and 50-251, Florida Power and Light CompanyThe Office1980-01-01
-
Standard review plan for the review of safety analysis reports for nuclear power plantsLWR edThe Office1980-01-01
-
Technical specifications, Sequoyah Nuclear Plant, Unit no. 1, Docket no. 50-327appendix "A" to license no. DPR-77Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1980-01-01
-
Safety evaluation report related to the operation of North Anna Power Station, Unit 2, Docket no. 50-339, Virginia Electric and Power Company.Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1980-01-01
-
Safety evaluation report related to the operation of Diablo Canyon Nuclear Power Station, Units 1 and 2, Docket nos. 50-275 and 50-323, Pacific Gas and Electric Company.National Technical Information Service1980-01-01
-
Standard technical specifications for General Electric boiling water reactors (BWR/5)Revision 3U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1980-01-01
-
Final environmental statement by the U.S. Nuclear Regulatory Commission for LaCrosse boiling water reactor proposed by Dairyland Power Cooperative, Docket no. 50-409.National Technical Information Service1980-01-01
-
Final supplement no. 1 to the final environmental statement by the U.S. Nuclear Regulatory Commission for Pebble Springs Nuclear Plant, Units 1 and 2, proposed by Portland General Electric Companydocket nos. 50-514, 50-515Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1980-01-01
-
Safety evaluation report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2, Dockets nos. 50-275 and 50-323, Pacific Gas and Electric Company.National Technical Information Service1980-01-01
-
Standard technical specifications for Babcock and Wilcox pressurized water reactorsRev. 4U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1980-01-01
-
Supplement no. 1 to the safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Tennessee Valley Authority, Sequoyah Nuclear Plant, units 1 and 2, Docket nos. 50-327 and 50-328U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1980-01-01
-
Safety evaluation report related to the operation of Sequoyah Nuclear Plant, Units 1 and 2, Dockets nos. 50-327 and 50-328, Tennessee Valley Authority.National Technical Information Service1980-01-01
-
Safety evaluation report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2, Docket nos. 50-275 and 50-323, Pacific Gas and Electric Company.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1980-01-01
-
Standard technical specifications for combustion engineering pressurized water reactorsRevision 2National Technical Information Service [distributor]1980-01-01
-
Second addendum to the Final environmental statement related to operation of North Anna Power Station, Units 1 and 2, Virginia Electric and Power Company, Docket nos. 50-338 and 50-339National Technical Information Service1980-01-01
-
Supplement no. 4 to the Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Public Service Electric and Gas Company, et al, Salem Nuclear Generating Station, Unit 2, Docket no. 50-311Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1980-01-01
-
Supplement no. 10 to the Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Virginia Electric and Power Company, North Anna Power Station, Unit 2, Docket Nos. 50-339.The Office1980-01-01
-
Draft supplement to final environmental statement related to the construction of Allens Creek Nuclear Generating Station, Unit no. 1, docket no. 50-466Houston Lighting & Power CompanyU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1980-01-01
-
Safety evaluation report related to the operation of Sequoyah Nuclear Plant, Units 1 and 2, Docket nos. 50-327 and 50-328, Tennessee Valley Authority.National Technical Information Service1980-01-01
-
Supplement no. 3 to the Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Duke Power Company, McGuire Nuclear Station, Units 1 and 2, Docket nos. 50-369 and 50-370.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1980-01-01
-
Technical specifications, Joseph M. Farley Nuclear Plant, Unit no. 2, Docket no. 50-364appendix "A" to license no. NPF-8Rev. 1Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1981-01-01
-
Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2, docket nos. 50-445 and 50-446Texas Utilities Generating Company, et al.Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1981-01-01
-
Safety evaluation report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2docket nos. 50-416 and 50-417 : Mississippi Power & Light Company, Middle South Energy, Inc., South Mississippi Electric Power Association.NRC/GPO Sales Program, U.S. Nuclear Regulatory Commission1981-01-01
-
Final environmental statement related to the operation of LaSalle County Station, Units 1 and 2, Docket nos. 50-373 and 50-374, Commonwealth Edison Company.The Office1981-01-01
-
Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2, Docket nos. 50-387 and 50-388, Pennsylvania Power & Light Company, Allegheny Electric Cooperative, Inc.National Technical Information Service1981-01-01
-
Safety evaluation report related to the operation of San Onofre Nuclear Generating Station, Units 2 and 3, Docket nos. 50-361 and 50-362, Southern California Edison Company, et al.National Technical Information Service1981-01-01
-
Draft environmental statement related to the operation of Callaway Plant, Unit no. 1, docket no. 50-483Union Electric CompanyNational Technical Information Service1981-01-01
-
Final environmental statement related to the operation of Virgil C. Summer Nuclear Station, Unit no. 1, Docket no. 50-395, South Carolina Electric and Gas CompanyNational Technical Information Service1981-01-01
-
Safety evaluation report related to the operation of Joseph M. Farley Nuclear Plant, Unit no. 2, Docket no. 50-364, Alabama Power Company.Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1981-01-01
-
Safety evaluation report related to the operation of Wm. H. Zimmer Nuclear Power Station, Unit no. 1, docket no. 50-358Cincinnati Gas and Electric Company.Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1981-01-01
-
Technical specifications, Sequoyah Nuclear Plant, Unit no. 2docket no. 50-328 : appendix "A" to license no. DPR-79.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1981-01-01
-
Draft environmental statement related to the operation of St. Lucie Plant, unit no. 2, docket no. 50-389, Florida Power and Light Company, Orlando Utilities Commission of the city of Orlando, FloridaU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1981-01-01
-
Final environmental statement related to the operation of William B. McGuire Nuclear Station, Units 1 and 2, Docket nos. 50-369 and 50-370, Duke Power Company.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1981-01-01
-
Final environmental statement related to the operation of Susquehanna Steam Electric Station, Units 1 and 2Docket nos. 50-387 and 50-388 : Pennsylvania Power and Light Company, Allegheny Electric Cooperative, Inc.The Office1981-01-01
-
Final programmatic environmental impact statement related to decontamination and disposal of radioactive wastes resulting from March 28, 1979, accident Three Mile Island Nuclear Station, Unit 2, Docket no. 50-320, Metropolitan Edison Company, Jersey Central Power and Light Company, Pennsylvania Electric Company.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1981-01-01
-
Technical specifications, McGuire Nuclear Station, Unit no. 1, docket no. 50-369, appendix "A" to license no. NPF-9Rev. 1U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1981-01-01
-
Partial safety evaluation report related to the operation of South Texas Project, Units 1 and 2, Docket nos. 50-498 and 50-499, Houston Lighting and Power Company.National Technical Information Service1981-01-01
-
Safety evaluation report related to the operation of Salem Nuclear Generating Station, Unit 2, Docket no. 50-311, Public Service Electric and Gas Company, et al.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1981-01-01
-
Safety evaluation report related to the operation of Virgil C. Summer Nuclear Station, Unit no. 1, Docket no. 50-395, South Carolina Electric and Gas Company.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1981-01-01
-
Final environmental statement related to the operation of Enrico Fermi Atomic Power Plant, Unit no. 2docket no. 50-341, Detroit Edison Company.National Technical Information Service [distributor]1981-01-01
-
Safety evaluation report related to the operation of Enrico Fermi Atomic Power Plant, Unit no. 2, docket no. 50-341Detroit Edison Company, et al.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1981-01-01
-
Technical specifications, Sequoyah Nuclear Plant, Units 1 and 2docket nos. 50-327 and 50-328 : appendix "B" to license nos. DPR-77 and DPR-79NRC/GPO Sales Program, U.S. Nuclear Regulatory Commission1981-01-01
-
Final environmental statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2, docket nos. 50-445 and 50-446Texas Utilities Generating Company.NRC/GPO Sales Program, U.S. Nuclear Regulatory Commission1981-01-01
-
Safety evaluation report related to the operation of Waterford Steam Electric Station, Unit no. 3, docket no. 50-382Louisiana Power & Light Company.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1981-01-01
-
Final environmental statement related to steam generator repair at Turkey Point Plant Units 3 and 4, Docket nos. 50-250 and 50-251, Florida Power and Light CompanyAvailable from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1981-01-01
-
Safety evaluation report related to the construction of Pilgrim Nuclear Generating Station, Unit no. 2, Docket no. 50-471, Boston Edison Company, et al.G.P.O. Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1981-01-01
-
Final environmental statement related to the operation of San Onofre Nuclear Generating Station, Units 2 and 3, Docket nos. 50-361 and 50-362, Southern California Edison Company, San Diego Gas & Electric Company, the City of Riverside, the City of Anaheim.Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1981-01-01
-
Supplement to draft environmental statement related to the operation of San Onofre Nuclear Generating Station, Units 2 and 3, docket nos. 50-361 and 50-362Southern California Edison Company, San Diego Gas & Electric Company, the City of Riverside, the City of AnaheimU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1981-01-01
-
Safety evaluation report related to the operation of the submerged demineralizer system at Three Mile Island Nuclear Station, Unit no. 2, docket no. 50-320Metropolitan Edison Company, Jersey Central Power and Light Company, Pennsylvania Electric Company.Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1981-01-01
-
Safety evaluation report related to the operation of Shoreham Nuclear Power Station, Unit no. 1, Docket no. 50-322, Long Island Lighting CompanyNational Technical Information Service1981-01-01
-
Safety evaluation report related to operation of McGuire Nuclear Station, Units 1 and 2, Duke Power Company, Office of Nuclear Reactor Regulation, U. S. Nuclear Regulatory Commission, Docket nos. 50-369 and 50-370.Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission1981-01-01
-
Safety evaluation report related to the operation of San Onofre Nuclear Generating Station, Units 2 and 3, docket nos. 50-361 and 50-362Southern California Edison Company, et al.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1981-01-01
-
Safety evaluation report related to the operation of LaSalle County Station, Units 1 and 2, docket nos. 50-373 and 374, Commonwealth Edison Company.National Technical Information Service1981-01-01
-
Draft environmental statement related to the operation of Wolf Creek Generating Station, Unit no. 1, docket no. STN 50-482Kansas Gas and Electric Company, et alU.S. Nuclear Regulatory Commission, Officeof Nuclear Reactor Regulation1982-01-01
-
Draft environmental statement related to the operation of Perry Nuclear Power Plant, units 1 and 2, docket nos. 50-440 and 50-441Cleveland Electric Illuminating CompanyThe Commission1982-01-01
-
Final environmental statement related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3docket nos. STN 50-528, STN 50-529, and STN 50-530 : Arizona Public Service Company, et alU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1982-01-01
-
Draft supplement to final environmental statement related to construction and operation of Clinch River Breeder Reactor Plant, docket no. 50-537U.S. Department of Energy, Tennessee Valley Authority, Project Management CorporationU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1982-01-01
-
Safety evaluation reports related to the operation of San Onofre Nuclear Generating Station, Units 2 and 3, docket nos. 50-361 and 50-362Southern California Edison Company, et alU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1982-01-01
-
Safety evaluation report related to the operation of Byron Station, Units 1 and 2, docket nos. STN 50-454 and STN 50-455Commonwealth Edison CompanyThe Commission1982-01-01
-
Supplement to final environmental statement related to the construction and operation of Clinch River Breeder Reactor Plant, docket no. 50-537, U.S. Department of Energy, Tennessee Valley Authority Project Management CorporationU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1982-01-01
-
Safety evaluation report related to the operation of Callaway Plant, Unit no. 1, docket STN 50-483Union Electric CompanyThe Commission1982-01-01
-
Draft environmental statement related to the operation of Seabrook Station, units 1 and 2, docket nos. 50-443 and 50-444Public Service Company of New Hampshire, et al.The Commission1982-01-01
-
Integrated plant safety assessmentsystematic evaluation program, Millstone Nuclear Power Station, Unit 1, Northeast Nuclear Energy Company, docket no. 50-245, draft reportU.S. Nuclear Regulatory Commission, Offic e of Nuclear Reactor Regulation1982-01-01
-
Integrated plant safety assessment, systematic evaluation program, Oyster Creek Nuclear Generating Station, GPU Nuclear Corporation and Jersey Central Power & Light Company, docket no. 50-219draft reportU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1982-01-01
-
Draft environmental statement related to license renewal and power increase for the National Bureau of Standards reactor, docket no. 50-184The Commission1982-01-01
-
USI A-43 resolution positionsOffice of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission1983-01-01
-
Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2, docket nos. 50-387 and 50-388Pennsylvania Power & Light Company, Allegheny Electric Cooperative, IncU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1983-01-01
-
Safety evaluation report related to the operation of Shoreham Nuclear Power Station, Unit no. 1, docket no. 50-322Long Island Lighting CompanyU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1983-01-01
-
Technical specifications, McGuire Nuclear Station, Unit nos. 1 and 2, docket nos. 50-369 and 50-370appendix "A" to license nos. NPF-9 and NPF-17The Commission1983-01-01
-
Integrated plant safety assessment, systematic evaluation program, Haddam Neck Plant, Connecticut Yankee Atomic Power Company, docket no. 50-213final reportU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1983-01-01
-
Integrated plant safety assessment, systematic evaluation program, La Crosse Boiling Water Reactor, Dairyland Power cooperative, docket no. 50-409draft reportU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1983-01-01
-
Integrated plant assessment, systematic evaluation program, Haddam Neck Plant, Connecticut Yankee Atomic Power Company, docket no. 50-213draft reportU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1983-01-01
-
U.S. Nuclear Regulatory Commission human factors program planOffice of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission1983-01-01
-
Standard review planRevision 4The Office1983-01-01
-
Technical specifications, WPPSS Nuclear Project no. 2Docket no. 50-397 : appendix "A" to license no. NPF-21The Office1983-01-01
-
Integrated plant safety assessment, systematic evaluation program, Big Rock Point Plant, Consumers Power Company, docket no. 50-155draft reportU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1983-01-01
-
Integrated plant safety assessment, systematic evaluation programPalisades Plant, Consumers Power Company, docket no. 50-255U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1983-01-01
-
GPU v. B&W lawsuit review and its effect on TMI-1 : Three Mile Island Nuclear Station, unit 1, docket 50-289Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission1983-01-01
-
Technical specifications, St. Lucie Plant, Unit no. 2, docket no. 50-389appendix "A" to license no. NPF-16The Commission1983-01-01
-
TMI - 1 restartan evaluation of the licensee's management integrity as it affects restart of Three Mile Island Nuclear Station, Unit 1, docket 50-289Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission1984-01-01
-
Technical specificationsPalo Verde Nuclear Generating Station, Unit no. 1, docket no. 50-528U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1984-01-01
-
Technical specifications, Wolf Creek Generating Station, Unit no. 1, docket no. STN 50-482appendix "A" to license no. NPF-32The Commission1985-01-01
-
Technical specificatons, Millstone Nuclear Power Station, Unit no. 3, docket no. 50-423appendix "A" to license no. NPF-44U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1985-01-01
-
Technical specifications Diablo Canyon Nuclear Power Plant, Unit no. 2, docket no. 50-323appendix "A" to license no. DPR-81The Commission1985-01-01
-
Regulatory analysis for proposed resolution of unresolved safety issue A-46seismic qualification of equipment in operating plantsOffice of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commissoin1985-01-01
-
Technical specifications, Waterford Steam Electric Station, Unit no. 3, docket no. 50-382appendix "A" to license no. NPF-38The Commission1985-01-01
-
Draft environmental statement for decommissioning Humboldt Bay Power Plant, Unit no. 3, docket no. 50-133Pacific Gas and Electric CompanyU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1986-01-01
-
Integrated plant safety assessment, systematic evaluation program, La Crosse Boiling Water Reactor, Dairyland Power Cooperative, docket no. 50-409.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1986-01-01
-
Programmatic environmental impact statement related to decontamination and disposal of radioactive wastes resulting from March 28, 1979 accident, Three Mile Island Nuclear Station, Unit 2, docket no. 50-320draft supplement dealing with post-defueling monitored storage and subsequent cleanup.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1989-01-01
-
Final environmental statement related to the operation of Limerick Generating Station, units 1 and 2, docket nos. 50-352 and 50-353, Philadelphia Electric CompanyU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1989-01-01
-
Technical specificationsComanche Peak Steam Electric Station, unit 1 : docket no. 50-445, appendix "A" to license no. NPF-87The Office1990-01-01
-
Standard technical specificationsGeneral Electric plants, BWR/4 : draft report for commentThe Office1991-01-01
-
Standard review plan.general guidanceRev. 0, July 1998.The Office1998-01-01
-
Standard review plan for trial use for the review of risk-informed inservice inspection of piping.U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation1998-01-01
-
The United States of America fifth national report for the Convention on nuclear safetyU.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation2010-01-01